Installation; Positioning The Machine; Electrical Connection; Water Connection - N'DUSTRIO LP302 Instrucciones Para Uso Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 90
6.3

6.3.1 Positioning the machine

Remove the packing with care.
Position the machine as shown on the installation diagram (lay-out) approved at the time
of the offer.
Maintain a minimum distance of about 50 mm from the walls, so that motors are ventilated.
Install suction hoods to assure proper ventilation of the room, in order to eliminate steam
Pict. 5
Pict. 6

Installation

and excessive humidity.
Check that the machine is properly levelled, by adjusting the legs.
In case of relocation of the machine, DO NOT use the lifting hooks of the
heat exchanger (if installed) to lift the whole machine (see pict.5).
Those hooks are designed to bear the weight of the heat exchanger only,
not the whole machine.

6.3.2 Electrical connection

The electrical connection shall be carried out in accordance to the local
laws in force.
The machine has a connection at the back, indicated by the symbol
that is meant to link the metal structure and masses among different
apparatuses, to prevent electro-static electrical
according to the power.
Should the electrical supply cable get damaged it shall be changed by
rotation (right rotation as per arrow on the casing).

6.3.3 Water connection

Connect the draining pipe, supplied with the appliance, to the connection
elbow located in the tank
The drain tube shall always be connected to a siphon in order to prevent
the release of odors.
If the water cannot be discharged to a level below the machine drain, it
is advisable to install a drain pump (supplied on request).

6.3.4 Start-up

At installation engineer's care.
shocks.
.
bottom.
EN
page 41

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

1.302.07.01.07.03

Tabla de contenido