Initial Start-Up Of The Timer; Preparing The Pump - Steinbach Active Balls 50 Manual Original

Ocultar thumbs Ver también para Active Balls 50:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 119
14. Wrap the manometer thread
Teflon tape.
15. Screw in the manometer at the
removal position of the bleeder screw
by turning it clockwise.
The filter vessel is prepared.

Initial start-up of the timer

The timer is going to function flawlessly even if you do not perform the steps
described below. However, should the power supply be interrupted, the
saved filter running times will be lost.
1. Make sure that the pump's power
cable is disconnected from the power
supply.
2. Use a Phillips PH1 screwdriver to
remove the screws of the timer cover
(turn counterclockwise).
3. Remove the cover.
4. Pull out the strip of plastic from
underneath the battery.
5. Replace the cover.
6. Screw in the screws clockwise.
The timer's memory backup function is activated.

Preparing the pump

At the time of delivery, the pump is only partially assembled.
Only hand-tighten all screw connections. Excessive tightening of the screw
connections damages seals and plastic components. Do not use any tools.
You can use Teflon tape to seal screw connections with minor leakage.
46
6
with
20
7
20

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Active balls 75

Tabla de contenido