Installation Instructions
NOTE:
Proceed to Installing Short Throw Projector Arm to
Bracket section to continue installation.
Steel Studs
IMPORTANT ! : See Site Requirements section before
proceeding with Steel Studs installation to ensure
installation site meets requirements! The drywall must
have a minimum thickness of 1/2"!
1.
Determine mounting location on wall. Use stud finder to
locate steel studs.
2.
Line up four holes on mounting bracket with center of studs
at desired mounting location. (See Figure 4)
3.
Using mounting bracket as a template, mark four holes at
the four holes in bracket. (See Figure 4)
4.
Drill four 1/2" holes at marked locations on wall. (See
Figure 4)
3
4
Figure 4
5.
Hold metal channel on Toggler® 1/4-20 (BB) Snap-Toggle
(not included) flat alongside plastic straps and slide channel
through hole. (See Figure 5)
Drywall
Plastic Straps
x 4
Figure 5
x 4
5
6.
Holding plastic straps on anchor, pull anchor away from wall
until channel rests flush behind wall making sure anchor
channel is positioned vertically on stud. (See Figure 6)
7.
Slide plastic cap on anchor towards wall until flange of cap
is flush with wall. (See Figure 6)
Steel Stud
Drywall
Plastic Cap
anchor x 4
Anchor Metal Channel
SIDE VIEW
8.
Snap off plastic straps on anchor at wall by pushing side to
side, snapping off straps level with flange of plastic cap.
(See Figure 7)
9.
Repeat Steps 6 through 8 for each mounting hole.
Steel Stud
Drywall
8
Plastic Cap
Plastic Straps
Anchor Metal Channel
SIDE VIEW
MSP-DCCUST1
7
Figure 6
Figure 7
6