• The times when the tool is switched off or when it is running but not
actually doing the job, may significantly reduce the exposure level.
Identify additional safety measures to protect the operator from the
effects of vibration such as: maintain the tool and the accessories,
keep the hands warm, organization of work patterns.
OPERATION
Note: The battery is partially charged. To ensure proper
operation of the power tool, the battery must be fully charged
before first use.
Charging
• Connect the micro USB plug to the charging socket (7) of the power tool.
• Connect the USB plug to the AC charger socket.
• Connect the charger to the power supply mains. The LED indicator
(6) on the power tool will lighten up and show the charging status.
Charging indicator
The power tool has a charging indicator (6) which indicates the status of
the charging process:
LED
Blinking
Continuous
• Fully charging the battery may take up to approximately 5 hours.
• Power tool may heat up during charging. It is a normal behavior.
EN
Battery charging in progress
Battery charging finished, battery fully charged
46
Status