WARNING! Read all instructions carefully and
completely before operating. Only trained
operators should use the crane and perform
daily inspections for all parts.
1.
Slide leg into Y-connector and secure with frame
pin and cotter pin. Insert knob and tighten until it
presses firmly against the leg. Repeat with remaining
legs. (See Figure 1)
NOTE: Use hole furthest from edge of leg.
Figure 1
2. Fit caster mounting bracket on leg and secure with
frame pin and cotter pin. Repeat with remaining
legs. (See Figure 2)
Figure 2
3. Bolt locking swivel caster to caster mounting bracket
using 3⁄8" bolts, washers, lock washers and nuts.
Tighten with 9⁄16" wrench. Repeat with remaining
legs. (See Figure 3)
Figure 3
PAGE 2 OF 9
SAFETY
ASSEMBLY
WARNING! Use caution when unpacking
and check for any damage that may have
occurred in transit.
WARNING! Make sure all hardware is tightened
when assembly is complete.
4. Fit I-beam mounting bracket with clamps on adjustable
post. Secure with top lock pin and cotter pin. Repeat
with the other adjustable post. (See Figure 4)
Figure 4
5. Slide adjustable post through Y-connector. At
desired height, insert the height adjustment pin and
cotter pin. Insert knob and tighten until it presses
firmly against the adjustable post. Repeat with the
other adjustable post. (See Figure 5)
NOTE: Set the height adjustment pins at the
same notch on each adjustable post to ensure
the gantry crane is level when standing.
Figure 5
0721 IH-8463