Installation; Preliminary Inspections; Pump Positioning - Alma RW AD 1500 - RW/RT AD 2000 - RW/RC AD 3000 - RW/RC AD 4000 - RC AD 6000 - RC AD 8000 RW1500 - RW2000 - RT/RTL2000 - RW2500 - RW3 Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

5. INSTALLATION

Pools, tanks or pits fi tted for the electric pump and positioning of the same in respect of drainage
system level are regulated by directives that must be respected.

5.1 PRELIMINARY INSPECTIONS

Before installation proceed as follows:
-
Check that implements and equipment used for handling, lifting and positioning are well dimensioned and
comply with local safety regulations.
-
Check that pit, pool or tank are well dimensioned and that water level assures a correct running of electric
pump with limited startings per hour.
Check, furthermore, that solids in suspension or other foreign materials able to clog the electric pump are not
present; install a grid when necessary.
-
Check that the electric network power is higher than the power absorbed by the electric pump.
-
Verify frequency, voltage, length of electric cables keeping in mind that the motor voltage should respect
limits indicated at par. 3.2.
-
Verify the effi ciency of all components (pannel, electrodes etc.).
-
Electric pumps equipped with oil chamber between
quantity of oil.
-
Verify the correct quantity of oil after transport, after a long period of inactivity, after storage in hot hambients
or whenever a lack of oil is presumed.

5.2 PUMP POSITIONING

Two different types of installation are possible:
-
Mobile when the electric pump is suspended by a proper chain in resistant material anchored to the lifting
handle.
-
Fixed when the electric pump stands on the bottom of pit or tank.
Ckeck that pit or tank are well dimensioned and that water level assures a correct running of the electric pump
with limited startings per hour.
Check, furthermore, that the pit is equipped with suitable devices to prevent that liquid dropping in the same
could cause any possible turbolence and air pockets in the pump suction.
All operations of installation must be carried out with the electric pump disconnected from general electric
network.
Fig. 3
Use and maintenance instructions
mechanical seals are already fi lled with the correct
Minimum level for
continuous running
Minimum level for short
running (2-3 min.)
English
Electric submersible pumps for sewage
Fig. 4
GB
GB
25

Publicidad

Tabla de contenido
loading

Tabla de contenido