Yakima LANDING PAD 6 Manual De Instrucciones página 3

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Carefully blow
away debris.
Engage cap with screw.
Do not tighten fully.
A helpful friend will
make this easier.
1033033C-3/12
Apply a silicone bead
around the holes.
Direct contact of uncured
sealant irritates eyes and may
irritate skin. Overexposure to
vapor may irritate eyes, nose
and throat. Avoid eye and skin
contact. Use with adequate
contact lenses with sealant on
hands. In case of eye contact,
flush with water for 15 minutes.
Obtain medical attention. In
case of skin contact, remove
from skin and flush with water.
Sealant releases acetic acid
(vinegar-like odor) during cure.
NoTE: Due to manufacturing
variances, shell thickness can
differ considerably. You may
need to eliminate spacer or
obtain longer bolts from your
local hardware store. Use a
stainless steel, sockethead 10-32
bolt in the desired length).
Attach SkyLine or
Control Towers and
finish tightening bolts.
WARNING:
ventilation. Do not handle
Refer to your SkyLine or
Control Tower instruction
to fully tighten Towers.
Take off Towers and assemble
Landing Pads.
• Attach rubber pads.
Bolt
Washer
Spacer
Install assembled Landing Pads into holes.
Firmly close
covers.

Publicidad

Tabla de contenido
loading

Tabla de contenido