Descargar Imprimir esta página

Installation Check-Up; Hot Water - LaCimbali M100 Manual Del Usuario

Ocultar thumbs Ver también para M100:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 109
WARNING
Installation Module C).
WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-leveling device is working properly.
The expansion valves are working properly
WARNING
THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING
TO THE INSTRUCTIONS BELOW:
GROUPS
Let each group dispense water for about a minute.

HOT WATER

the "Hot water dispensing" chapter in the User's Manual).
STEAM (also with Turbosteam)
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
02_M100_multi_ridotto.indd 5

5. Installation Check-up

11/03/2014 10:27:48

Publicidad

loading