EN
Safety instructions
Before commissioning, please check all components for
damage and only use the supplied components.
Technical data
Supply: DC 5V / 4A
Commissioning
Only use the supplied power adaptor unit for the power
supply and connect it with the power supply port (6). Then
connect the CONNECT Box to your network via the LAN
port using a network cable (5). The CONNECT Box starts
automatically.
To access the box, please open the address http://connect-
box.local. If the call is not successful, please contact the
network administrator to manually obtain the IP address of
the device with the host name connectbox.
7