Descargar Imprimir esta página

Uline H-2450 Instrucciones De Montaje página 4

Publicidad

Idiomas disponibles

Idiomas disponibles

RIGHT SIDE OF THE UNIT
15. Snap four sets of shelf supports at the top of the two
inner tall posts and two outer posts.
(See Figure 14)
16. Slide the rectangular shelf onto the posts until it
slides firmly over the supports. (See Figure 14)
Figure 14
17. Slide garment rod hangers onto garment rod.
(See Figure 15)
Figure 15
18. Slide the longer end of garment rod hangers
through the shelf wires. (See Figure 16)
Figure 16
PAGE 4 OF 12
ASSEMBLY CONTINUED
19. Hook the short end of garment rod hangers onto the
center wire of the shelf. (See Figure 17)
20. Pull garment rod back and down, one side at a time,
until long end of garment rod hanger snaps into
place.
21. Once unit is assembled, slide the baskets in.
22. Insert pins in the center of the basket support bars.
1-800-295-5510
uline.com
Figure 17
View from the bottom
0721 IH-2450

Publicidad

loading