Evers FX-HV Serie Manual De Instrucciones página 19

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

1. Hang the HV system at the Horizontal
eyelet to a crane or a suitable hoist
Caution: The hoist must be moved at least
about an axis so that the load can be carried
when erecting and folding in the direction of
the pivot axis: Avoid any load sway
3. Position the magnet according to the
workpiece size so that the center of gravity
of the Workpiece in a horizontal position is
about centrally located below the magnet.
Insert the bolts and the Safety pin (Fig.2.4)
5. Switch the hoist from Horizontal eyelet to
Verticel eyelet
18
3.2 LIFTING OPERATION FROM HORIZONTAL TO VERTICAL
2. Proceed the HV system to the workpiece
you want to lift
4. The stops must rest irmly on the Lower
edge of the workpiece to prevent a slippage
of the load in vertical operation. (Fig.1) If this
is the case, turn ON the magnet
(Notice FX operating instructions)

Publicidad

Tabla de contenido
loading

Productos relacionados para Evers FX-HV Serie

Tabla de contenido