Descargar Imprimir esta página

POLTI Vaporella Al Professsional Manual De Instrucciones página 24

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 8
ENGLISH
OPERATION
1) Insert the cable stand (7) in its lo-
cation. Place the cable (iron
power supply - steam tube) in its
support (Fig. 1).
2) Unscrew the patented safety cap
(5) and fill the boiler with about
1.5 litres of ordinary tap water
using the special funnel, making
sure that it does not overflow (Fig.
2). Retighten the cap fully and ca-
refully. Plug the iron into a suita-
ble power socket.
3) Switch on the boiler and iron by
pressing the switches
(11); the Steam Pressure war-
ning light (3). (Fig. 3) will then
come on.
FIG. 1
FIG. 2
FIG. 3
(9) and

Publicidad

loading