Assembling The Accessories - Sime Solida EV 3 Manual Del Usuario

Ocultar thumbs Ver también para Solida EV 3:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 35
tents).
–. Frequent. replenishment. water. inlets. in.
the.plant.
–. If. the. partial. or. total. emptying. of. the.
plant.should.be.necessary..
4.4
ASSEMBLING
THE ACCESSORIES
(fig. 5 - fig. 5/a)
The. port. closing. handles. and. the. screw.
with.knob.for.the.air.gate.damper.regula-
tion.is.supplied.separately,.as.they.can.be.
damaged.during.transport..
Both.the.handles.and.the.screw.with.knob.
are.contained.in.nylon.bags.inside.the.ash.
collecting.tray.
To. assemble. the. handles,. proceed. in. the.
following.way.(fig..5):
–. Take. a. handle. (1),. insert. it. in. the. load.
port.slot.(2).and.insert.the.roll.(3).inside.
the.handle.hole;.block.the.handle.by.in-
serting.the.elastic.split.pin.(4).
–. Carry. out. the. same. operation. for. the.
handle.of.the.ash-pit.port.
To.assemble.the.screw.with.knob,.proceed.
in.the.following.way.(fig..5/a):
–. Remove.screw.M8.x.60.that.fastens.the.
air.gate.damper.to.the.ash-pit.port.and.
6
5
38
tighten.the.screw.with.Bakelite.knob.(1).
supplied..Place.the.blind.nut.with.cap.(2).
at.the.end.of.screw.M.10.
–. Fasten.lever.M6.(3).to.the.air.gate.dam-
per.placing.it.in.a.horizontal.direction.on.
the.right...The.lever.has.an.opening.at.its.
end,. where. the. chainlet. of. the. thermo-
static.regulator.will.be.connected.
4.5
ASSEMBLING
THE CASING
(fig. 6)
From.the.rear.of.the.boiler,.on.two.upper.tie.
rods,.three.nuts.are.tightened:.the.second.
and. the. third. nut. serve. to. place. correctly.
the. lateral. sides. of. the. casing.. On. the. lo-
8
1
KEY
1. Handle
2. Load.port
3. Roll
4. Elastic.split.pin
1
2
KEY
1. Screw.with.knob.M10.x.70
2. Blind.nut.with.cap
3. Lever.M6
7
4
2
Fig..5
3
Fig..5/a
Fig..6

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Solida ev 4Solida ev 5Solida ev 6Solida ev 7Solida ev

Tabla de contenido