Anchor Outdoor Unit - Carrier 42QZL Manual De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 51
Step 2: Install drain joint (Heat pump unit only)
Before bolting the outdoor unit in place, you must install
the drain joint at the bottom of the unit. Note that there
are two different types of drain joints depending on the
type of outdoor unit.
If the drain joint comes with a rubber seal (see Fig.
A), do the following:
1. Fit the rubber seal on the end of the drain joint that
will connect to the outdoor unit.
2. Insert the drain joint into the hole in the base pan of
the unit.
3. Rotate the drain joint 90° until it clicks in place facing
the front of the unit.
4. Connect a drain hose extension (not included) to
the drain joint to redirect water from the unit during
heating mode.
If the drain joint doesn't come with a rubber seal
(see Fig. B), do the following:
1. Insert the drain joint into the hole in the base pan of the
unit. The drain joint will click in place.
2. Connect a drain hose extension (not included) to the
drain joint to redirect water from the unit during heating
mode.
Seal
Seal
Drain joint
(A)
IN COLD CLIMATES
In cold climates, make sure that the drain hose is as
vertical as possible to ensure swift water drainage. If
water drains too slowly, it can freeze in the hose and
flood the unit.
Base pan hole of
outdoor unit
(B)
Step 3: Anchor outdoor unit
The outdoor unit can be anchored to the ground or to
a wall-mounted bracket with bolt (M10). Prepare the
installation base of the unit according to the dimensions
below.
UNIT MOUNTING DIMENSIONS
The following is a list of different outdoor unit sizes
and the distance between their mounting feet. Prepare
the installation base of the unit according to the
dimensions below.
Outdoor Unit Types and Specifications
Split Type Outdoor Unit
Page 11-GB

Publicidad

Tabla de contenido
loading

Tabla de contenido