3
INSTALLING THE OPERATOR
Assembly positions and levels
Procedure
Secure the base plate to the floor
AB
All manuals and user guides at all-guides.com
1 Position the ducts (1) for electrical installation.
2 Secure the base plate (2) to the floor, taking into
3 Level the base plate (2).
1
Gate
2
Rack
3
Base plate
4
Drive pinion
5
Operator
6
Magnet holder plates
7
Opening limit switch magnet
8
Closing limit switch magnet
account the assembly levels.
Introduce the anchor bolts in the base when the
cement is still wet.
PUMA operator for sliding gates
INSTALLATION
49