Commissioning - Palazzetti ECOMONOBLOCCO WT R Serie Manual De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

6

Commissioning

After positioning the appliance it is necessary to perform the following operations:
1. Open the door.
2. Make sure that the flue inspection valve is in the closed position with the rod positioned in the
appropriate bracket (Fig. 6.1a).
3. Insert in sequence the spacer, deflectors and O
- Fig. 6.1d).
Product images are purely indicative
RING as shown in the diagram (Fig. 6.1b - Fig. 6.1c
2
Fig. 6.1a
Fig. 6.1c
220 mm
004778150 - 18/08/2020
Fig. 6.1b
Fig. 6.1d
33

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ecomonoblocco wt l serie

Tabla de contenido