Assembly; Electrical Requirements - Yonanas deluxe Manual De Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY

ASSEMBLE CHUTE
1. Place bottom of gasket into the bottom cap.
TOP 3-3/4"
9.5 cm
BOTTOM 4-1/4"
10.8 cm
NOTE: There is a top and bottom to the
gasket. The top measures 3-3/4 inches
and the bottom measures 4-1/4 inches.
The gasket fits snuggly in the bottom cap.
2. Carefully set the blade cone on the gasket.
Always insert gasket
into cap before
screwing cap into
the blade cover.
3. Screw bottom cap into
the chute and blade cover.

ELECTRICAL REQUIREMENTS

1. Power Switch
2. Electrical Cord
Do not use an extension cord. If the cord
provided is too short, move the appliance
closer to an outlet. Place bowl in front of
unit underneath spout.
www.yonanas.com
BOTTOM 4-1/4"
10.8 cm
TOP 3-3/4"
9.5 cm
PLACE & LOCK CHUTE
TO BASE
4. Place chute assembly on base.
Interlocking mechanism in base
prevents motor from running when
chute assembly is not in place.
5. Rotate counter-clockwise until chute assembly
clicks into the locked position.
1
2
3

Publicidad

Tabla de contenido
loading

Productos relacionados para Yonanas deluxe

Este manual también es adecuado para:

Elite

Tabla de contenido