English
5. START UP INSTRUCTIONS
5.1. LIST OF MATERIALS
The machine includes the following elements that you
will find in the box:
• Pump.
• Adaptor.
• Instruction manual.
Remove all elements from the box and check that all
are included.
Remove carefully all the elements from the box
and make sure that all listed parts are included. Due
to the quality controls done at the factory it is highly
improbable that your machine has any faulty part
or that any elements are missing. If you find any
damaged part or there are any elements missing,
do not use the machine until the problem has been
solved or you have been given the missing parts.
Usage of the machine with defective or missing parts
is dangerous and could result in personal injuries.
5.2. MOUNTING AND INSTALLATION
This machine comes mounted and ready for use. No
mounting is necessary except for the coupling of the
impulsion hose, height adjustment of the buoy and
connecting the pump to the mains.
5.2.1. INSTALLATION OF THE IMPULSION HOSE
Connect the hose to the water exit of the pump.
This hose has an exit adaptor that allows different
sizes of hose to be fitted to the pump.
This pump has an exit adaptor with connectors for 25
mm hoses using an O ring.
5.2.2. ADJUSTING THE BUOY
The starting and stopping height of the pump can be
adapted by regulating the amount of free cable of the
buoy. The longer the cable from the buoy to the fixing
point of the pump, the pump will need more water
height to start and will work giving less water height.
It is important to always leave
at least 5 cm of cable free
between the buoy and fixing
point of the pump so that
the buoy can move freely
and therefore start and stop
the pump depending on the
water height.
If you submerge the pump in a small place, ensure
that the buoy has sufficient room to move up and
down. If the buoy does not have sufficient room it will
block and will not allow the pump to stop before the
water finishes. The pump will work with no water, it
will wear out more quickly and a breakage could take
place.
5.3. CHECKING POINTS BEFORE SUBMERGING THE
PUMP
It is important to check that all parts are well
tightened. Tighten, repair and replace all necessary
before using the machine.
5.4. PUMP SUBMERSION
Place the pump in the water by holding the
transport handle and ensuring the machine is in a
vertical position. The pump can be placed on the
bottom of the surface if the water is clean and has
22/72
5 cm