Installing The Can Converter - Conergy SmartControl System Manual De Uso

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Result
Conergy SmartControl System
CAUTION!
The Conergy SmartControl carries high voltages!
All devices installed next to the Conergy SmartControl and
the power supply unit must be equipped with at least basic
insulation.
| The Conergy SmartControl and the power supply unit
should be installed so that they are not in contact with the
230 V power supply.
Mounting on the DIN top-hat rail
1. Slide the four mounting rail bus connectors onto the top-
hat rail.
2. Fit the power supply unit (1) to the first two projecting
cable pins of the mounting rail bus connector.
Fig. 6-6: Plugging the power supply unit onto the top-hat rail
3. Fit the Conergy SmartControl (3) next to the power supply
unit (1) on the next two cable pins of the mounting rail bus
connector (2).
The Conergy SmartControl and the power supply unit are
connected to one another via the DIN top-hat rail and the
mounting rail bus connectors.
6.4

Installing the CAN converter

The Conergy IPG series central inverters offered at present
still do not have a CAN interface, and so you will need a CAN
converter for each inverter. The CAN converter consists of
DIN top-hat rail housing and is intended for installation on a
DIN top-hat rail in accordance with DIN EN 50022 next to the
Conergy SmartControl and the power supply unit.
Operating manual
6 Assembly and installation
(1)
(2)
(3)
41

Publicidad

Tabla de contenido
loading

Tabla de contenido