Operating Instructions - Stihl BT 120 C Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1
:
Pull off the spark plug boot (1).
:
Unscrew and dry off the spark plug.
:
Open the throttle wide.
:
Pull the starter rope several times
to clear the combustion chamber.
:
Fit the spark plug and connect the
spark plug boot – press it down
firmly.
:
Move the slide control to START.
:
Move the choke knob to e even if
the engine is cold.
:
Now start the engine.
BT 120 C
Throttle cable adjustment
:
Check adjustment of throttle cable –
see chapter on "Adjusting the
Throttle Cable".
If tank has been run completely dry
and then refilled:
:
Press the fuel pump bulb at least
fives times.
:
Now start the engine.
English / USA

Operating Instructions

During Break-in Period
A factory new machine should not be run
at high revs (full throttle off load) for the
first three tank fillings. This avoids
unnecessary high loads during the
break-in period. As all moving parts
have to bed in during the break-in
period, the frictional resistances in the
engine are greater during this period.
The engine develops its maximum
power after about 5 to 15 tank fillings.
During Operation
After a long period of full-throttle
operation, allow engine to run for a while
at idle speed so that the heat in the
engine can be dissipated by the flow of
cooling air. This protects engine-
mounted components (ignition,
carburetor) from thermal overload.
After Finishing Work
Wait for the engine to cool down. Drain
the fuel Kraftstofftank and store the
machine in a dry place. Check the
tightness of all accessible screws and
nuts (not adjusting screws) at regular
regulars and retighten as necessary.
17

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido