Set Up And Operation - TECshow NAVIGATOR SPLIT 8 Manual De Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. INSTALLATION
Remove all packing materials from the Navigator
Split 8. Check that all foam and plastic padding is
removed. Connect all cables.
Do not supply power before the whole sys-
tem is set up and connected properly. Always
disconnect from electric mains power supply
before cleaning or servicing. Damages caused by
non-observance are not subject to warranty.

6. SET UP AND OPERATION

Before plugging the unit in, always make sure that
the power supply matches the product specifi-
cation voltage. Do not attempt to operate a 120V
specification product on 230V power, or vice versa.
Remove all packing materials from the Navigator
Split 8. Check that all foam and plastic padding is
removed.
You will need a serial data link to run light shows
of one or more fixtures using a DMX-512 control-
ler or to run synchronized shows on two or more
fixtures set to a master/slave operating mode. The
combined number of channels required by all the
fixtures on a serial data link determines the number
of fixtures the data link can support.
DMX Setup Example
1. Fasten the movingheads onto firm trussing.
Leave at least 0,5 meter on all sides for air circu-
lation.
2. Always use a safety cable (ordercode 70140 /
70141).
3. Use a 3-p XLR cable to connect the moving-
heads and other devices.
4. Link the units as shown, Connect a DMX signal
cable from the DMX controller's DMX "out"
| Tecshow Navigator Split 8
English version
P. 7

Publicidad

Tabla de contenido
loading

Tabla de contenido