Torin BIG RED T83006 Manual Del Proprietário página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

SYSTEM AIR PURGE PROCEDURE
IMPORTANT: BEFORE FIRST USE
Perform the following Air Purge Procedure to remove any air that may have been introduced into the hydraulic
system as a result of product shipment and handling. This step is to be completed without any weight on the
jack.
1. Turn release valve counter-vclockwise one full
turn to the open position.
2. Rapidly pump the handle 6-8 times. Leave handle
in down position to expose oil fill plug.
3. Remove cover plate.
Cover Plate
7
4. With a flat blade screwdriver, push the oil fill plug
slightly to the side to purge trapped air from
system. (Use caution not to tear or puncture the
oil plug.)
5. Replace cover plate and the jack is now ready for
use. Check for proper pump action.
6. Turn release valve clockwise to the closed
position.
Screwdriver

Publicidad

Tabla de contenido
loading

Tabla de contenido