BASIC ASSEMBLY
1
Fit the Tap Handle
onto the Tap Faucet.
REMOVING THE INCLUDED 5L GROWLER
1.
For both the CO2 line and beer line, squeeze the
white button 1 as shown in the image below, while
simultaneously pulling the corresponding line 2 to release
from the Growler.
2.
When the CO2 and beer lines have been released, it will
look like this.
3.
Use the Growler handle to lift the Growler
out of the Cooling Cavity.
7
2
Slide the notches on
the Drip Tray into the
tabs located at the
bottom of the main unit
3
Make sure the Drain Tab
is in the closed position,
like shown above.
1
2
1
2