7. Repeat steps 2 to 6 with the second slot in dolly.
8. Turn tank upside down so bottom is facing up.
9. Place axle upright on a hard surface and hammer on one cap nut.
10. Place one wheel on axle and slide down to cap nut. Be sure flat side of wheel
hub is facing outward.
11. Slide axle through holes provided in tool rack.
12. Slide remaining wheel onto axle and hammer on second cap nut.
13. Install tool rack assembly onto dolly (already installed on tank) by placing large
slot in tool rack over rim on back of dolly. Push tool rack onto dolly until the
bottom of tool rack is flush with bottom of dolly. NOTE: It is normal for tool rack to
fit tightly onto dolly.
14. Secure with four screws provided.
15. If plastic flat washers are included in hardware pack, place one flat washer over
stem of each caster. NOTE: Flat washers are not required with all units.
16. Insert casters into front of dolly by placing stem of casters into holes provided.
Apply pressure and twisting motion until casters snap into place.
17. Return tank to upright position.
PAGE 6
ASSEMBLY (CONT'D.)