Installation - Blumfeldt Gold Bar 2000 Manual Del Usario

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

EN
14

INSTALLATION

Before the installation, the following matters need your attention
• Products should be put down gently.
• Installation in acidic and alkaline environments is not recommended.
• The product must be earthed.
• The products are required to check the product brand mark on the
voltage
• and the local voltage whether conform.
• Ensure the power rating should have sufficient current carrying
capacity.
Ensure the production's installation site
For safe use of the product, the
product installation position
should have a minimum height
of 1.8 m from the ground, and
a minimum distance of 0.5 m
from ceiling, roof and both
sides walls.
Installation steps
1.
According to where
the product installa-
tion location is, use
a power drill to make
four 8 mm round
holes.
2.
Insert the three plas-
tic wall anchors into
the three holes.

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

1003024710031513

Tabla de contenido