Sanus VLT7-B2 Manual De Instrucciones página 8

Tabla de contenido

Publicidad

STEP 2C
CAUTION:
Avoid potential personal injury
or property damage!
● Studs must be at least 2x4 / 25 ga.
● If back side of wall is unfinished, drywall must be
installed to a minimum of one stud left and right
of the stud(s) being used to install the mount
● Drywall must be a minimum of 1/2 in. (13
mm) thick on each side of the studs, and a
minimum clearance of 1 ⅞ in. (48 mm)
behind the wall is required
● This product must be centered on the studs
● Stud type and structural strength must conform to
the North American Specification for the Design of
Cold-Formed Steel Structural Members
[362 S 125 18, C-Shape, S - Stud Section]
● Drywall must be secured to studs with screws
12 in. (304.8 mm) on center
4
POSITION TEMPLATE
06
To calculate your precise wall plate location, check out
TIP:
our Height Finder at sanus.com [www.san.us/2567].
6
INSTALL ANCHORS
a
S1
c
P
S1
CAUTION:
Be sure cap
seated against the drywall surface.
8
Steel Stud Installation
1
Visit
HeightFinder™
www.
san.us/2567
b
S1
d
S1
is
P
Min. 16 in. (40.6 cm)
LOCATE
5
DRILL
4X
CAUTION:
7
SECURELY TIGHTEN
07
Open
covers
CAUTION:
Avoid potential personal injury or property damage!
Do not over-tighten the lag bolts
firmly against the wall plate
Steel Stud Installation Kit SSMK1 (NOT INCLUDED)
S2
x4
S1
1/4-20 x 1 ¾ in.
1/4-20 SNAP Toggle BB
*
Contact Customer Service to inquire about the additional hardware.
2
VERIFY
06
Be sure you drill into the CENTER of the stud.
4X
S3
S2
. Tighten the lag bolts only until they are pulled
S2
.
07
*
x4
x4
S3
1/4 in.
3
MARK
1 in. (25 mm)
1/2 in.
(13 mm)
Close
bottom
cover

Publicidad

Tabla de contenido
loading

Tabla de contenido