12 FAULT TRACING
The Newton lifting trolley has been designed and tested to achieve optimal operational
reliability and service life, under the proviso that routine maintenance is carried out in
accordance with the specified instructions. If despite this a problem should occur, use the
fault tracing table below to obtain relevant guidance.
Remove the load from the load bed before any troubleshooting and repairs.
Inspections, service and repairs must be carried out by qualified personnel.
If problems persist after you have taken the measures specified in the list below, you
should contact an authorised repairman or your supplier.
Symptom
Load bed does not move on signal A. Check that the main switch is ON.
When repairs have been carried out to the lifting trolley, conduct a full performance
test with full load before using the trolley again.
13 INSTRUCTIONS FOR RE-USE
Do not throw the spent batteries in the waste, but dispose of them at an
organised collection point.
The machine is manufactured from recyclable materials, or of materials that
can be reused. Specialist companies take care of the worn-out machines,
dismantle them and utilise any material that can be reused.
Procedure
B. Connect the charger to the mains and to the lifting
trolley and let it charge for at least 8 hours.
C. If the load bed does not move after the measure
specified in point B, contact an authorised repair
shop and/or your supplier.
14