Digital Switch - GDS
Cooper Lighting Solutions LCCNP (N on Plenum) or
Cable Type
Cooper Lighting Solu tions LCC P ( Plenum) or
Belden1502R (Non Plenum) or 1502P (plenum)
Max. cable
1000 ft/305 m
length
Refer to panel Installation Instructions for proper
Devices
# of devices. If additional devices are required the
per
EXPS-24 accessory power supply will allow an
segment
additional 25 devices per panel.
Termination
The CANbus link is a 'daisy-chain' protocol that requires
termination on the devices located at either end of the
chain.
Device
Device
The Greengate Digital Switch is supplied with termination
enabled as standard. If the Greengate digital switch is not
connected as an end device in the chain, you need to disable
termination.
To disable termination, move the jumper from the upper two pins
to the lower two pins as shown here.
Termination ON
www.cooperlighting.com
Device
ControlKeeper M
Termination OFF
Attaching Wall Plate
With the cover in place, insert and lightly tighten the two
retaining screws.
Changing Buttons
The Greengate Digital Switch station allows you to change
the buttons in order to customize its appearance.
1. Remove the front cover.
2. Locate the four clips (two on each side) of the button frame.
Carefully press in all four clips to disengage the button frame
and pull the frame away from the main body.
3. You can now remove the buttons from the frame and replace.
Button frame
with buttons
4. With the new buttons in place within the frame, align its clips
with the four holes of the main body and press it into place
so that all four clips click as they lock.
5. With the plate in place, insert and lightly tighten the two
retaining screws.
Ambient Atmosphere Requirements
Temperature: 32° F to 104° F (0° C to +40° C)
Humidity: 0 to 95% non-condensing
Greengate
Main
body
9850-000877-01 page 3
February 2022