Working With The Unit; Putting The Unit Into Operation - Steinberg Systems SBS-RS-40 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 116
It should be hung under a roof, which will prevent the sensor from getting wet from
rain.

3.3. Working with the unit

3.3.1.

Putting the unit into operation

1. Open the battery compartment of the main station.
2. Insert 3 batteries according to polarity.
3. Close the chamber.
4. All the icons will appear on the display and the display itself will flash 3 colors
(orange, red and white) consecutively for 3 seconds.
5. Upon startup, the display will assume an initial interface containing factory
data. It will indicate the current temperature and humidity of the room it is in
(behind the "IN" icon) [1].
The unit will start 3-minute RF signal recording
and reception of channels 1, 2, 3, as indicated by
the "" icon.

Publicidad

Tabla de contenido
loading

Tabla de contenido