Technical specs
Hot supply index
Cold supply index
Limits of use recommended by UNI EN 817 for good functioning
Pressure
Temperature
Warning
It is of fundamental importance that the device is installed respecting the
input positions of the water supply, hot on the left and cold on the right.
It is necessary to execute a very careful flushing of the system to prevent
damage both to the faucet and the technological devices installed.
The supply pipes must be rinsed carefully before installing the mixer, so
that no chips, welding residues or other impurities remain inside the pipes.
A centralised filter would protect the system from impurities contained in
the water.
In order to guarantee a long product life it is better to install under-sink
taps with a filter, to be cleaned periodically.
Before starting up, unscrew the aerator and rinse very well.
In case of supply pressures over 5 bar, we recommend the installation of
a pressure reducer for the proper function of the equipment.
Installations performed differently than indicated do not allow the mixer to
operate properly.
Cartridge maintenance (pag.14)
To perform maintenance or check the cartridge, remember to shut off the
water supply and relieve internal pressures by opening the tap.
Remove the cap, if present, unscrew the grub screw and remove
the handle.
With the appropriate key dismount the ring of block.
Check the cartridge and replace if damaged.
Proceed in reverse order to reassemble the whole.
Aerator maintenance (pag.15)
Unscrew the aerator with the appropriate wrench.
Rinse the impurities or replace the aerator.
Min = 1 bar
left, red color
right, blue color
Max = 4 bar
Max = 65
o
23