3.
INSTALLATION
3.1.
Box contents
•
1x complete Square gas fireplace
•
4x Tempered glass screen
•
4x adjustable legs
•
1x AAA Batteries (placed under the ignition button)
•
1x box of decorative stones
•
1x 4 metre rubber gas linkage – installed
•
1x pressure regulator (37mbar) – installed
•
1x installation manual and user's manual
3.2.
Unboxing and installation
• The contents of the boxes need to be carefully unwrapped from the foam foil.
• Remove the bags with decorative stones from the burner reservoir and place them away from it.
• Remove the Styrofoam placed on the unit.
• Carefully lift the appliance and pull out the glass shield wrapped in cardboard from the inside of The Square.
• Check the completeness of the elements with the contents list.
• Make sure that the device nor its elements weren't damaged during the transportation (if they were, notify the
supplier).
• Place Square on a flat, paved surface outside of the building, preferably on the place of final installation. Leave
sufficient space on the side of the appliance where control panel is located (minimum 1 m).
• The decorative stones are to be scattered evenly around the reservoir to completely cover the burner of the
fireplace.
• Install carefully the side glass shields (See point 3.3).
• If all the points were completed according to the instruction the gas bottle can be now connected
Fig. 2
–SQUARE ignition elements detail
5