STRAMARI 2320
UNLOCKING OPERATIONS AND REMOVAL OF THE BOLLARD
Removal of the bollard:
- Insert the specially shaped spanner into the lock under the bollard cover.
- To unlock and remove the bollard, turn the spanner clockwise and lift the bollard out of the socket.
- Let the bollard stand and remove the spanner by turning it anti-clockwise.
- Cover the socket by means of the lid provided with the equipment.
Setting the bollard back:
carry out the previous operations in the reverse sequence: insert the spanner, turn it clockwise and put the bollard back into the
socket, then lock it in position and remove the spanner by turning it anti-clockwise.
1
F A D IN
I
l'a p
ri c an ce
llo
OVERALL DIMENSIONS
Ø 275
thickness 4 mm
Ø 293
Post
7542
GB
Drwg. No.
- removable
2
F A D IN
I
l'a p
ri c an ce
llo
Ø 340
Ground socket
INSTRUCTIONS STRAMARI 2320
3
F A D IN
I
l'a p
ri c an ce
llo
Slot to lock
the post into the socket
Bollard finish
Bollard weight
Ground socket weight
Cover weight
Bollard weight with ground socket
Impact resistance
[A]
Breakout resistance
[A]
[A] Various factors, such as the compaction index, soil permeability coefficient and kind
of concrete may reduce the values indicated even significantly.
Ø 340
Socket cover
4
Socket
cover
F A D IN
I
l'a p
ri c an ce
llo
RAL 7016 anthracite grey
33 kg
11 kg
3,5 kg
44 kg
40.000 J
240.000 J