INSTALLATION INSTRUCTIONS
1A
INSTALL WITH ESCUTCHEON
Turn off hot and cold water
supplies before beginning.
FAUCET
BASE
• Insert Supply Line(s), Power Chord, and Mounting
Shank through ESCUTCHEON (5) and the
counter top.
• Push WASHER (2) on to MOUNTING SHANK (3).
• Thread NUT (1) on to MOUNTING SHNAK (3).
• Ensure that O-RING (4) is properly seated between
the faucet base and the ESCUTCHEON (5) before
tightening NUT (1).
A
5
4
PUTTY
3
SINK OR
MOUNTING
2
SURFACE
1
1B
INSTALL WITHOUT ESCUTCHEON
Turn off hot and cold water
supplies before beginning.
FAUCET
BASE
• Insert Supply Lines, Power Chord, and Mounting
Shank through the counter top.
• Push WASHER (2) on to MOUNTING SHANK (3).
• Thread NUT (1) on to MOUTNING SHANK (3).
• Ensure that O-RING (4) is properly seated
between the faucet base and the counter top
before tightening NUT (1).
A
4
3
SINK OR
MOUNTING
2
SURFACE
1