OPERATING INSTRUCTION
All tools must be provided with earth prot
Installa
ated die head
(Fig.3)
For installa
ated die head on a fusion splicer which is fixed on a support, select a heated die head
according to the specifica
requir
die head shall be with its smaller end in front and its larger end at back.
Startup by powering
(Fig.1) (Fig.4)
(The power source must be provided with earth wire) The green indicator will be on and the red indicator 5
will be off once the power is connected, which indicates that the fusion splicer is under the automa cally-
controlling status and it can be operated. Note: The automa
fusion splicer is under the temperature control status, having no effect on opera
Methods for fusion splicing of pipes
Cut off the pipes v
cally with a pipe cu er, put the pipe and the fi
splicer simultaneously without rota
fi
ately once the hea
the required depth rapidly, straightly and uniformly without rota
Welding temperature adjustment
(Fig.2)
The pipes of different material shall be welded at different temperatures. The welding temperature can be
regulated through the regulator 3, and the range of the temperature will be 50-300 ℃ .
Parameters of welded pipe
Outer diameter of
Hot
pth
Hea
fi
(mm)
20
14
25
16
32
20
40
21
50
22.5
63
24
Note: The hea
extended by 50% if the ambient temperature is lower than 5 ℃ .
CLEANING AND MAINTANCE
Please shut down the tool and cut off the power before any maintenance is carried out.
Maintenance
The power tool is excellently designed, can run for a long term and only requires a very li
maintenance. In order to achieve a con
regular cleaning are required.
Lubrica
The power tool is not required t
ENVIRONMENT
Do not dispose of electric tools, accessories and packaging together with household waste material -
in observance of European Dir
ve 2002/96/EC on waste of electric and electronic equipment and its
implementa
cordance with na
aw, electric tools that have reached the end of their life must
be collected separately and returned to an environmentally compa
TROUBLE SHOOTING
Fault Symptom
Possible Cause
No power
The switch is on but the splicer
does not work
The switch indicator is not on
4
efore opera
hten with an internal hex wrench. Generally, the
temperature control status only shows the
nto the die head of the fusion
rate according to the following table. Take the pipe and
eved, insert the pipe in the fi
to form a uniform flange on the joint.
5
4
7
4
8
4
12
6
18
6
24
6
a sfactory working effect, proper maintenance and
cated.
recycling facility.
Tr
Inspect and repair the hea
by a professional
Inspect and repair the switch and
the power by a professional
GB
No temperature adjustment
No change of hea
No hea
to
3
3
4
4
5
6
wire
The temperature regulator fails
Replace the temperature regulator
by a professional
cator
The temperature protector fails
Replace the temperature protector
with one of the same specifica
by a professional
The plug is not plugged into the
Put the plug into the socket
power socket
No voltage at the power socket
Inspect and repair the power supply
The hea
re is damaged
Replace the hea
one of the same specifica
professional
GB
n
wire with
by a
5