Descargar Imprimir esta página

Kohler K-16109 Guia De Instalacion página 4

Grifería para fregadero
Ocultar thumbs Ver también para K-16109:

Publicidad

Idiomas disponibles

Idiomas disponibles

Plumbers
Putty
Valve
Body
Washer
2. Valve Body/Tee Installation
- Apply a bead of plumbers putty or other sealant to the undersides of
the handle escutcheons according to the putty manufacturer's
instructions.
- Insert the valve bodies into the mounting holes from the top of the
sink. Make sure the hot valve body (marked red) is installed in the
left-hand hole (as viewed from the front of the sink).
- Install a washer and nut to the bottom of the valve bodies.
- Align the valve bodies so the copper tubing faces to the outside.
- Wrench tighten the nuts.
- Remove any excess plumbers putty.
- Connect the hoses to the shank tee, and tighten.
A
1004636-2-
Escutcheon
Shank
Tee
Hose
Nut
4
Kohler Co.

Publicidad

loading

Este manual también es adecuado para:

K-16111