Qlima PEC 3015 S Instrucciones De Uso página 29

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

>1000
>500
Hanging Installation
Mark and drill 2 Ø8 holes on the ceiling as per diagram.
Insert plastic plugs (#1) 2pcs into the holes.
Screws (#3) 2pcs longer ones go through the mounting pole (#2) and fasten
on the ceiling.
Insert the hanging lines (#4) 2pcs into the line holes (#A) of mounting pole
(#2). Length can be manually adjusted by pushing the switch of hole (#A).
Clip the power cord on the cable clip (#B) of mounting pole (#2).
B
A
Wall/Ceiling Mounted Installation
Mark and drill 4 Ø8 holes on the wall or ceiling as per diagram.
Insert plastic plugs (#1) 4pcs into the holes.
Screws (#3) 4pcs shorter ones go through the mounting bracket (#2) 1pc and
fasten on the wall or ceiling.
Parallel insert the bracket (#2) into the sheet (#4), fasten with screw (#5) 1pc.
Fasten the screw (#A) of the bracket (#2) after adjust the suitable angle for
using the heater.
>500
1
2
3
4
1
>500
2
3
A
4
5
4
29

Publicidad

Tabla de contenido
loading

Tabla de contenido