Descargar Imprimir esta página

Angelo Po 10CP1EA Manual De Uso E Instalación página 47

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

ASSEMBLY APPLIANCES IN BANKS
To assemble appliances in banks (side by side)
proceed as described below.
1 - Pull off the knob (A).
2 - Undo the screws (C) and remove the control
panels (B).
3 - Apply masking tape to the edges to be placed
side by side.
4 - Apply food-approved sealant to the edges to be
placed side by side.
5 - Place the appliances side by side.
6 - Connect the appliance using the screws and
nuts (D-E).
7 - Remove the excess sealant and the masking
tape.
8 - Apply the sealant to the inside of the lid (F), and
fit it to cover the fixing zone.
9 - Replace the control panels (B) and the knobs
(A) on completion of the operation.
Important
Do not install anything on the left-hand side
of the appliance.
A variety of optional installation kits are available for
arranging appliances in banks:
G)"Bridge" installation kit
WATER CONNECTION
To make the connection, connect the mains line to
the appliance's connection pipe, fitting a shut-off
tap (A), to allow the water supply to be cut off when
necessary. Easily accessible filters must be fitted
downstream of the tap.
Caution - warning
The appliance must be supplied with drinking
water having the characteristics shown in the
table.
Description
Pressure
pH
Conductivity
Hardness
Salt and metallic ion
content
Chlorides
Sulphates
Iron
Copper
Manganese
Value
150÷300 kPa (1,5÷3 bar) (*)
7÷7.5
< 200 mS/cm
9÷13°f (5÷7°d, 6.3÷8.8°e,
90÷125 ppm)
< 30 mg/l
< 40 mg/l
< 0,1 mg/l
< 0.05 mg/l
< 0,05 mg/l
- 21 -
A
B
C
D
E
G
A
(*) If the intake pressure exceeds 3 bar fit a pressure reducer.
F
IDM-39614401700
IDM-39617801000
IDM 39617803000 tif
English
IT
GB
DE
FR
ES

Publicidad

loading

Este manual también es adecuado para:

12cp1ea18cp2ea