Descargar Imprimir esta página

Atlas Copco MT Focus 400 CHN Instrucciones Del Producto página 11

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 72
MT Focus 400
I/O
INT -24V
EXT-OUT-COM0
EXT-OUT0...EXT- OUT3
EXT-IN0...EXT- IN3
EXT-IN-COM0
DGND
Mechanical installation of controller
The controller can be used in three ways:
• Standing on a work bench.
• Attached to a vertical surface using the wall bracket.
• Attached to a vertical surface using screws from the rear side.
Wall bracket attachment
1. Attach the bracket to the surface using four 5 mm screws.
2. Pull out the plunger of the underside of the bracket and slide the controller
into the bracket.
3. The controller is held in placed by the plunger when released.
Rear screw attachment
1. Remove the two crews holding the controller foot.
2. Drill two 5 mm holes in the surface, corresponding to the holes in the con-
troller rear side. Leave space over the holes for the connectors and the
sound opening.
3. Attach the controller to the surface, preferrably with the removed screws.
NOTICE
• The screws must not protrude into the controller more than 10 mm.
Installation requirements
EN
Description
+24 V output
Connect to DGND
or external 0 V.
The outputs will be connected to the external 0 V
when activated.
The inputs will be activated by a 0 V signal applied to
the input pin.
Connect to INT +24V
or external +24 V
(not at the same time)
0 V output
© Atlas Copco Industrial Technique AB - 9836 791600 00
Installation
11

Publicidad

loading

Este manual también es adecuado para:

8432 0850 03