Descargar Imprimir esta página

Cooper Lighting Solutions Sure-Lites AP2SQLED Serie Instrucciones De Instalación página 2

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions for Sure_Lites AP2SQLED Series LED Emergency Light
Important:
Let the battery charge up for at least 24 hours. Then normal
operation of this unit should take effect. To check, press
the " TEST " button. The LED lamps on the unit should
turn ON. During an electrical power failure, the led lamps
will automatically come on for a minimum of 90 minutes.
In accordance with NFPA 101, your emergency lighting
system must be tested monthly for a minimum of 30
seconds and annually for 90 minutes. Refer to your local
codes for any additional requirements that may apply.
Important safeguards:
When using electrical equipment, basic safety precautions
should always be followed including the following:
FLEXIBLE CONDUIT ONLY
Installation (J-Box mounting)
1.
Feed fixture leads through the back plate and connect
to AC power supply (Fig. A). For 120V use black and
white wires and for 277V, use red and white wires.
2.
Unused wires must be capped using enclosed wire
nuts.
3.
Attach back plate to J-Box and secure with screws.
4.
Complete the battery connection. (Fig. B)
5.
Align snaps and push housing directly onto the back
plate (Fig. C). Apply continuous AC power and press
"TEST" button to check light.
2
COOPER LIGHTING SOLUTIONS
IB50519821
Installation instructions
Installation (conduit)
1.
Secure back plate to wall surface. Route wires through
hole in conduit flange and make conduit connection.
For 120V, use black and white wires and for 277V, use
red and white wires.
2.
Unused wires must be capped using enclosed wire
nuts.
3.
Complete the battery connection (Fig. B).
4.
Remove the conduit cover located at the top of the
housing. Align snaps and push housing directly onto
the back plate (Fig. C). Apply continuous AC power and
press "TEST" button to check light.
Fig.A (J-Box)
BATTERY CONNECTOR
PLUG IN
Fig.B
Fig.C

Publicidad

loading