Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Commissioning, operation / 6. Faults
5.3 Commissioning, operation
Check the sealing at the process connection over the entire scale
range before commissioning.
EN
Pressure surges must be avoided at all costs, open the shut-off
valves slowly.
The instrument must not be subjected to any external loading (e.g.
use as a climbing aid, support for objects).

6. Faults

Personnel: Skilled personnel
CAUTION!
Physical injuries and damage to property and the
environment
If faults cannot be eliminated by means of the listed
measures, the instrument must be taken out of operation
immediately.
For contact details see chapter 1 "General information" or the
back page of the operating instructions.
16
Ensure that there is no longer any pressure present and
protect against being put into operation accidentally.
Contact the manufacturer.
If a return is needed, please follow the instructions given in
chapter 8.2 "Return".
WIKA operating instructions pressure gauge, model PG23HP

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pg23hp-pPg23hp-s

Tabla de contenido