Descargar Imprimir esta página

ATH-Heinl M156 Manual De Instrucciones página 60

Publicidad

2.0
INSTALLATION
The machine must be installed by an authorised person according to the instructions.
The operating instructions (including the log) are an important part
The product must be checked after completion of the installation, handover, if necessary briefing and then
regularly in accordance with the applicable regulations and legal provisions in the country of operation by a
suitable and approved company or facility.
2.1
Transport & Storage Conditions
When transporting and positioning the machine, always use suitable lifting and material handling
equipment and consider the machine's centre of gravity.
The machine should only be transported with the original packaging.
Data:
Width
Length
Height
Weight (gross)
2.2
Unpacking the machine
Remove the top cover of the packaging and make sure that no damage has occurred
during transport.
Remove the safety bolt to remove the machine from the pallet / rack.
Use a suitable lifting device (possibly with a stopping rope) to lower the machine from the
pallet / frame.
The packaging material used for the machine should be stored carefully.
Keep the packaging material out of the reach of children as it may be hazardous.
® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2020-03
of the machine / product.
!!!PLEASE STORE CAREFULLY!!!
1930 mm
2180 mm
1100 mm
984 kg
Manufacturer ATH-Heinl GmbH & CO.KG
- 14 -

Publicidad

loading

Productos relacionados para ATH-Heinl M156