Descargar Imprimir esta página

How To Install - Premier AB-5029PM Manual De Instrucciones

Ventilador de piso de 16

Publicidad

Idiomas disponibles

Idiomas disponibles

1. Put the end cap at the end of the cross base.
2. Fasten the lower pipe on the cross base with screw A(4pcs).
3. Slide the base cover onto the cross base along the lower pipe
4. Pull the extension pole out, and then tighten the out-joint.
5. Place the motor and switch box firmly on the top of the extension pole, and tighten screw B.
6. To finish assemble the guard and blade on the front part of the motor.
7. To change the direction and height, loosen the out joint and adjust the extension pole at a suitable
position then tighten the out-joint again.
8. If the blade is shaking , please change the blade into another direction, then, try it again.
Check before installation :
1. Unpack the product to check if all the accessories are availabel
2.
Check
the voltage shown in the name plate to see if it accords with the local situation.
3. Check the motor if it can move smoothly
Install :
1. Assemble the pole on the base with 4 screw of M5 X10
2. Fix the base on the black bottom with 4 screw of M4X16. (if it is available)
3. Unscrew Pipe Locker, Pull the stainless pipe at proper height and then tighten the pipe locker again.
4. Unscrew the pipe holder, connect the fan body firmly on the top of the stainless pipe and fasten the
pipe holder again.
5. Please take off the nut and put the rear guard into the front of the motor house, tighten the nut firmly,
then put the fan blade into the motor axis (be sure to put Horizontal bolt into blade groove) and
tighten the blade screw anti-clookwise.
6. Put front guard and close clip or screw grills ring to secure guards together.
P-4
INSTRUCTION MANUAL OF STAND FAN
***********************************************************

How to install

Publicidad

loading