Descargar Imprimir esta página

Pfister G89 Serie Manual De Instrucciones página 4

Ocultar thumbs Ver también para G89 Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

10 SHOWER ARM INSTALLATION
Insert the longer end of Shower Arm (10A) through the Shower Flange (10B).
Apply PTFE plumber's tape to both ends of Shower Arm (10A) according to
manufacturer's instructions. Screw the end of Shower Arm (10A) into pipe
elbow inside the wall. Slide Shower Flange (10B) tight to the wall.
11
11A
11B
11 SPOUT INSTALLATION
Apply PTFE plumbers tape on both ends of Pipe Nipple (11A) (not included).
Screw Pipe Nipple (11A) into the elbow inside the wall and tighten with pipe
wrench. The Pipe Nipple (11A) is to project 3 ⅞" to 4" from the finished wall.
Screw Tub Spout (11B) onto Pipe Nipple (11A) and tighten until Spout is properly
positioned and flush to the finished wall.
12 UNIT START UP
Turn on hot and cold water supplies, and check all connections for leaks.
13
13A
CLOSED
13 FLOW FUNCTION
By rotating the Lever Handle (13A) counterclockwise, the valve will be activated.
The water flow will increase by continuing to rotate the Lever Handle (13A).
ENGLISH
14
14 TUB SPOUT FUNCTION
When the valve is turned on, water normally flows through the Tub Spout (14A).
To activate the shower, turn valve on and pull the Knob (14B) up. Hold on until
water flows continuously from the shower arm.
15
/
" to 4 "
3
7
8
15 FINAL FLUSHING
For final flushing, turn valve on and allow water to run through the Tub Spout
(15A) for several minutes. Pull Spout Knob (15B) up to allow water to run through
Shower Arm (15C). Allow water to run for several minutes until all foreign matter
clears the line.
16
OPEN
16 SHOWER HEAD INSTALLATION
Thread Shower Head (16A) onto Shower Arm (16B).
4
14B
14A
15C
UP
15B
For
Shower
16B
16A
Make sure Shower Head (16A) is securely tightened to Shower Arm (16B).
15A

Publicidad

loading