Boom Setup (cont'd)
Down Pull Starting from Teepee Position
1. Set the brakes.
2. Pivot the elbow one or two detent positions
outward. Lift up on the nose to release any preload
on the detent pin securing the back boom to the
elbow.
3. While holding the detent out, rotate the elbow
on the back boom 180° by walking it around the
carriage.
Greenlee / A Textron Company
®
Ultra Tugger
10 Cable Puller and Pulling Packages
Rotate 180°
23
4. Lower the entire boom until the forward boom is
close to vertical.
5. Lower the forward boom until the elbow is close to
the angle desired for the pull setup.
6. Raise or lower the boom until the nose is just below
the conduit to be pulled from.
To use slip-in couplings:
a. Insert the appropriate slip-in conduit adapter
coupling into the nose.
b. Pivot the nose until the coupling is aligned with
the conduit and lock in position.
c. Lower the boom until the coupling clears the
conduit.
d. Release the brakes.
e. Roll the carriage forward until the coupling is
under the conduit and raise it.
To use screw-on couplings:
a. Screw the appropriate screw-on adapter cou-
pling fully onto the conduit.
b. Pivot the nose until it is aligned with the cou-
pling and lock in position.
c. Lower the boom until the coupling clears the
conduit.
d. Release the brakes.
e. Roll the carriage forward until the nose is under
the coupling, pull the detent ring, and raise the
nose onto the coupling.
Typical Down Pull Setup
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070