Descargar Imprimir esta página

Black and Decker Pfister Avalon GT26-4CBC Instrucciones De Instalación página 5

Grifo monomando con rociador lateral y dispensador de jabón

Publicidad

Idiomas disponibles

Idiomas disponibles

15
15C
15B
HOT
15A
Connect water Supply Lines (15A) to Faucet Inlets (15B). Hot water supply
line goes to hot inlet fitting indicated by Tag (15C). (Supply lines not included).
Follow manufacturer's instructions when installing supply lines.
16 UNIT START UP
16
Turn on hot and cold water supplies, and check for leaks above and below the sink.
Note: After installation is complete, flush faucet (see step 21).
17 SPOUT FUNCTION
Spout (17A) can be rotated around the Faucet Body in any direction.
FAUCET FUNCTIONS
17
18 VALVE FUNCTION
15B
COLD
15A
17A
ENGLISH
18
ON
18A
By lifting Lever Handle (18A) up, the valve will be activated allowing water to
flow. The water flow will increase by continuing to lift up Lever Handle (18A).
By rotating Lever Handle (18A) counterclockwise, the water temperature will
decreased to fully cold. By rotating Lever Handle (18A) clockwise, the water
temperature will increased to fully hot.
19 SIDE SPRAY OPERATION
19
Side Spray (19A) can be pulled out to spray water in any direction. To activate
the Side Spray (19A), press Toggle Button (19B) located on the back of Side
Spray (19A).
20 SOAP DISPENSER OPERATION
20
To activate Soap Dispenser (20A), press Dispenser Head (20B) to dispense
liquid soap.
21 FLUSHING & AERATOR CLEANING
5
HOT
18A
19B
19A
20B
20A
COLD

Publicidad

loading