VBM REPLICA HX Manual De Instrucciones página 62

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

8.3,
FIRST STARTING.
W ARNING: The first machine starting operations must be carried out by a specialised and authorised technician.
Open the water supply tap upstream of the machine.
Turn the switch (1) to position "
Wait until the boiler is full, then raise the lever (3) of each unit to dispense water so as to fill the coffee heat exchangers.
Lower the levers (3).
Turn the switch (1) to position "
When the set temperature has been reached, the LED (4) will go off and the pressure in the boiler will be 1.2-1.3 bar (0.12-0.13
MPa) indicated on the pressure gauge (5).
Dispense a few times from the units, water tap and steam nozzles checking proper functioning (see the paragraph on operation
for how to operate).
22
"; the LED (2) will come on and the boiler will automatically start to fill with water.
"; the LED (4) will come on indicating that the boiler heating element is on.

Publicidad

Tabla de contenido
loading

Tabla de contenido