Descargar Imprimir esta página

Accessmatic BD850 Manual De Usuario página 28

Publicidad

Idiomas disponibles

Idiomas disponibles

Size of mounting plate
Installation procedures
Preparation work before installation
Please make sure that the sliding gate is correctly installed, the gate rail is horizontal, and the gate can be manually moved
smoothly before installing the gate opener.
Cable installation
In order to guarantee the normal operation of the gate opener and protect the cables from damages, please bury the motor
& power cable and controlling cable separately with two PVC tubes.
Concrete pedestal
Please precast a concrete pedestal with the size can be 400mm x 250mm, depth be 200mm in advance, so as to rmly install
BD850 gate opener. Please make sure the distance between the gate and gate opener is appropriate before casting the
pedestal. Embedded screws
Opening your life
Concrete
Power line
Opening your life
204±0.3
150
Φ
8× 10
Mounting plate
Foundation bolt
6
BD850
Code:
Figure 3
Figure 4
www.accessmatic.com

Publicidad

loading

Este manual también es adecuado para:

Bulldozer 850