Descargar Imprimir esta página

EDSAL Muscle Rack LR4747-SV Instrucciones De Montaje página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

Assembly Instructions
Step 8
- Install Wire Decking (F)
Install the three Wire Decking (F) onto the beams. Note: It is important the wire decking is installed perpendicular to
the tie support.
F
F
Step 9
- Install Final Hardware
Install two Flanged Hex Bolts (I), two Small Washers (K) and two Hex Locknuts (J) into the second post slot location
(from bottom of post), just above the rivet of the beams. Repeat for all other sides.
Final Inspection
Make sure all rivets are secure into the
bottom of the slots and all nuts and bolts
are securely tightened.
F

Publicidad

loading

Productos relacionados para EDSAL Muscle Rack LR4747-SV