11. Line up the wood dowels in panels D & H with the holes on the top
of shelf B and the cam lock dowels on shelf B with the holes in the
bottom edge of panels D & H. Push panels D & H down onto shelf
B until flush. Insert 3 cam locks into the bottom holes of panels D &
H. Make sure the arrows on the cam locks are facing down toward
shelf B. Turn the cam locks to tighten. Do not strip the cam locks by
over tightening.
Repeat process for panels E & I.
12. Note: Top is heavy. It is recommended that 2 people be used at this
point in the assembly.
Line up the wood dowels in the top of the mantel assembly with
the holes in the underside of top A. Also make sure the cam lock
dowels on the underside of top A are lined up with the holes in
the in the top of the mantel assembly. Push top A down until flush.
Insert 6 cam locks into the holes on panels D, H, E, and I. Make
sure the arrows on the cam locks are facing up toward the top A.
Turn the cam locks to tighten. Do not strip the cam locks by over
tightening.
D
H
B
Hardware Used
a
Cam Lock
A
D
H
Hardware Used
a
Cam Lock
E
I
x 6
E
I
x 6
7