Descargar Imprimir esta página

Craftsman INCREDI-PULL 316.292620 Manual Del Usuario página 12

Ocultar thumbs Ver también para INCREDI-PULL 316.292620:

Publicidad

Idiomas disponibles

Idiomas disponibles

MAINTENANCE AND REPAIR INSTRUCTIONS
MAINTENANCE SCHEDULE
Perform these required maintenance procedures at the
frequency stated in the table. These procedures should
also be a part of any seasonal tune-up.
NOTE: Some maintenance procedures may require
special tools or skills. If you are unsure about
these procedures, take your unit to a Sears or
other qualified service dealer. Call 1-800-4-MY-
HOME® for more information.
WARNING:
maintenance or repairs with unit running.
Always service and repair a cool unit.
Disconnect the spark plug wire to ensure that
the unit cannot start.
FREQUENCY
Before starting engine
Every 10 hours
Every 25 hours
Every 50 hours
TINE REMOVAL AND REPLACEMENT
All 4 tines should be replaced at the same time because
they will wear evenly through normal use. Work on one
side at a time.
WARNING:
heavy gloves when handling the tines.
1. Put the On/Off Stop Control in the STOP (O) position
and disconnect the spark plug boot from the plug.
NOTE: It may be necessary to lay the cultivator back in a
horizontal position on a flat level surface with the
handles touching the ground.
2. Remove the click pin from each end of the tine shaft.
Slide the tines off of the shaft (Fig. 11).
3. Clean and oil the shaft.
4. When you are reinstalling tines, lay out the tines and
compare them to those shown in Figure 12. Note
specifics about each tine: its hub, curvature and
lettering ("A" or "B"). This will help make sure that
you are placing the correct tines in the correct order.
NOTE: If you look closely, you can see a slight curvature
in the tine tips. These curves should point toward
the front of the cultivator when the tines are
installed. Figure 12 shows the curve in each tine.
5. Using Figures 11 and 12 for reference, slide on the
new tines with the hubs facing outward.
The tines are stamped "A" or "B." The tine order
should be "B, A, B, A" from left to right when facing
the cultivator from the front.
6. Secure the new tines to the shaft with click pins. It
may be necessary to wash the dirt off the tines and
shaft to help during this entire process.
12
To prevent serious
injury, never perform
MAINTENANCE REQUIRED
Fill fuel tank with fresh fuel mix
Clean and re-oil air filter
Check and clean spark arrestor
Check spark plug condition and gap
Inspect exhaust port and spark arrestor screen for clogging or
obstruction to assure maximum performance levels
To prevent serious
injury, always wear
NOTE: Maintenance, replacement, or repair of the
emission control devices and system may be
performed by a Sears or other qualified service
dealer. Call 1-800-4-MY-HOME® for more
information.
In order to assure peak performance of your engine,
inspection of the engine exhaust port may be necessary
after 50 hours of operation. If you notice lost RPM, poor
performance or general lack of acceleration, this service
may be required. If you feel your engine is in need of this
inspection, refer service to a Sears or other qualified
service dealer. Call 1-800-4-MY-HOME® for more
information. DO NOT attempt to perform this process
yourself as engine damage may result from contaminants
involved in the cleaning process for the port.
"B" Tine
"A" Tine
Cultivator
Front
Hubs
Hubs on back side
(not shown)
"B" Tine
Cultivator
Front
REFER TO
Page 9
Page 13
Page 13
Page 14
Pages 13 & 14
"B" Tine
"A" Tine
Click Pin
Fig. 11
"A" Tine
"B" Tine
"A" Tine
Fig. 12
Hubs

Publicidad

loading

Este manual también es adecuado para:

Incredi-pull 316.2926221cs122r799